Kitchen Remodeling

The most demanding
room, done
right.

A kitchen touches plumbing, electrical, gas, ventilation, cabinetry, and stone — all coordinated by one accountable team, not six subcontractors on six different schedules.

Get a Free Quote

We’ve built kitchens across Los Angeles and Ventura Counties for more than 30 years, as a single licensed contractor overseeing every trade in sequence. Every project is fully permitted, inspected, and scoped in writing before it begins — under California license #1094201.

Dining & Kitchen — Warm wood tones against a marble backsplash.
Dining & KitchenWarm wood tones against a marble backsplash.
Waterfall Island — A full-slab marble island under linear pendants.
Waterfall IslandA full-slab marble island under linear pendants.
Ebonized Cabinetry — Blackened cabinetry with a brass hood and under-lighting.
Ebonized CabinetryBlackened cabinetry with a brass hood and under-lighting.
Black Granite Island — A long waterfall-edge island in honed granite.
Black Granite IslandA long waterfall-edge island in honed granite.
Island & Gallery Wall — Framed art overlooking a matte black island.
Island & Gallery WallFramed art overlooking a matte black island.
Island & Staircase — A dark marble island beside an open stair.
Island & StaircaseA dark marble island beside an open stair.
Farmhouse Kitchen — A paneled refrigerator and tile backsplash.
Farmhouse KitchenA paneled refrigerator and tile backsplash.
Brick Backsplash — Exposed brick against white shaker cabinetry.
Brick BacksplashExposed brick against white shaker cabinetry.
Open to Living — A long island seating six, open to the living room.
Open to LivingA long island seating six, open to the living room.
Integrated Pantry — A paneled cold-storage wall, flush with the cabinetry.
Integrated PantryA paneled cold-storage wall, flush with the cabinetry.
Island Detail — Brass hardware against a matte black island.
Island DetailBrass hardware against a matte black island.
What’s Included

Every project,
scoped in writing.

  • 01Layout & Space PlanningWork triangles, island placement, and sightlines, resolved before anything is ordered.
  • 02Custom CabinetryFull-height cabinetry, integrated panels, and finish carpentry scribed to your actual walls.
  • 03Countertops & StoneNatural stone, engineered quartz, and porcelain, including waterfall edges and full-height backsplashes.
  • 04Plumbing & GasSupply, waste, and gas lines relocated to code, including pot fillers and filtration systems.
  • 05VentilationCorrectly sized hood systems with genuine exterior ducting, sized to code and appliance spec.
  • 06Finishes & FitPaint, trim, hardware, appliance installation, and a punch walkthrough before we call it done.
How the Project Runs

The same sequence,
every time.

  • 01

    Consultation & Site Visit

    We walk the space with you, take measurements, and talk through how you use it today and what you need it to do. This visit is free and carries no obligation.

  • 02

    Design & Scope

    We develop the plan and a written scope of work, and settle materials before anything is signed. You see exactly what is and isn’t included.

  • 03

    Permits & Pre-Construction

    We submit drawings, pull the permits required by your city or county, and order long-lead items around their lead times.

  • 04

    Demolition & Rough-In

    Protection goes down, demolition happens, and structural, plumbing, and electrical changes are completed and inspected.

  • 05

    Installation & Finishes

    Cabinetry, stone, tile, flooring, fixtures, and finishes follow in sequence, each trade handed off cleanly to the next.

  • 06

    Walkthrough & Close-Out

    We walk the finished space with you, build and complete a punch list, and hand over warranty documentation.

Common Questions

Questions,
answered honestly.

Your contract is built on a defined scope, not a rough estimate — every material, fixture, and labor line is priced before we break ground. If something outside that scope turns up once work starts, you get a written change order with the exact cost before anything proceeds, never a surprise on the final invoice.

We build your schedule around the real LA permitting and inspection calendar, not a best-case guess, so the date you sign off on already accounts for plan-check and inspection wait times. If something outside our control pushes it, you hear about it the same week — not the week the deadline passes.

You get a single point of contact for the entire job, not a rotating cast of subs to chase down. We check in with you daily — by phone and by message — so you're never finding out about a problem after it's already cost you time.

Every job closes with a walkthrough and a written punch list — nothing is “done” until every item on it is fixed and you've signed off. We stand behind our work with the guarantee spelled out in your contract, and every trade that requires a license gets a licensed sub, not unlicensed labor to save a day.

We pull permits for anything LA requires a permit for, full stop, even when a smaller scope makes it tempting to skip. That protects you two ways: the city inspects the work as a second set of eyes beyond ours, and you're never the one holding an unpermitted addition when it's time to sell.

Yes — moving a sink, even a few feet, means rerouting the drain and supply lines, which requires a plumbing permit under LA's building code. If the rest of your kitchen scope is straightforward, LADBS's Express Permit program can often issue this same-day rather than going through full plan check. What it doesn't cover is skipping the permit — an unpermitted drain relocation is exactly the kind of thing that surfaces at your home inspection when you go to sell.

There's no single statewide code number for kitchen aisle width the way there is for a commercial exit path — the widely used minimum is 36 inches for a walkway and 42–48 inches for a working aisle with room to cook, and that's what we design your island to. Where it does become a real code issue is if the island blocks a required path to an exit door — that's not a guideline, that's a problem we catch in the design phase, before anything gets ordered.

If it's in a wall or ceiling we're already opening as part of your scope, it gets replaced to current code — that's standard, not an upcharge surprise, since anything we touch has to meet today's electrical code, not the code from when the house was built. Knob-and-tube elsewhere in the house that we're not touching can legally stay if it's in good condition, but we'll flag it either way — most insurers charge more, or decline coverage outright, for a home with any active knob-and-tube.