Roofing and solar,
engineered
to last.
A roof protects the home; solar lets it work harder. We handle both under one team, so the two systems are installed to work together, not around each other.
Get a Free QuoteWe’ve engineered and installed roofing systems — and, increasingly, the solar arrays that go with them — across Los Angeles and Ventura Counties for more than 30 years. Every install is permitted and inspected under California license #1094201.
Every project,
scoped in writing.
- 01Inspection & AssessmentA full evaluation of your existing roof before we recommend repair or replacement.
- 02Tear-Off & Deck RepairRemoving failed material down to the deck, and repairing any rot or damage found underneath.
- 03Material InstallationTile, shingle, or flat/foam roofing, installed to manufacturer spec and local code.
- 04Solar IntegrationPanels sized and mounted as part of the roof system, wired and permitted alongside the roof itself.
- 05Flashing & WaterproofingCorrectly detailed flashing at every valley, chimney, and penetration point.
- 06VentilationAttic and roof ventilation sized to prevent heat and moisture buildup.
- 07Warranty & DocumentationManufacturer and workmanship warranty paperwork, handed over at close-out.
The same sequence,
every time.
- 01
Consultation & Site Visit
We walk the space with you, take measurements, and talk through how you use it today and what you need it to do. This visit is free and carries no obligation.
- 02
Design & Scope
We develop the plan and a written scope of work, and settle materials before anything is signed. You see exactly what is and isn’t included.
- 03
Permits & Pre-Construction
We submit drawings, pull the permits required by your city or county, and order long-lead items around their lead times.
- 04
Demolition & Rough-In
Protection goes down, demolition happens, and structural, plumbing, and electrical changes are completed and inspected.
- 05
Installation & Finishes
Cabinetry, stone, tile, flooring, fixtures, and finishes follow in sequence, each trade handed off cleanly to the next.
- 06
Walkthrough & Close-Out
We walk the finished space with you, build and complete a punch list, and hand over warranty documentation.
Questions,
answered honestly.
Your contract is built on a defined scope, not a rough estimate — every material, fixture, and labor line is priced before we break ground. If something outside that scope turns up once work starts, you get a written change order with the exact cost before anything proceeds, never a surprise on the final invoice.
We build your schedule around the real LA permitting and inspection calendar, not a best-case guess, so the date you sign off on already accounts for plan-check and inspection wait times. If something outside our control pushes it, you hear about it the same week — not the week the deadline passes.
You get a single point of contact for the entire job, not a rotating cast of subs to chase down. We check in with you daily — by phone and by message — so you're never finding out about a problem after it's already cost you time.
Every job closes with a walkthrough and a written punch list — nothing is “done” until every item on it is fixed and you've signed off. We stand behind our work with the guarantee spelled out in your contract, and every trade that requires a license gets a licensed sub, not unlicensed labor to save a day.
We pull permits for anything LA requires a permit for, full stop, even when a smaller scope makes it tempting to skip. That protects you two ways: the city inspects the work as a second set of eyes beyond ours, and you're never the one holding an unpermitted addition when it's time to sell.
Yes — a full re-roof requires a building permit and a final inspection, even when you're replacing like-for-like material. We pull the permit as part of the project so the work is inspected and on record, not something that surfaces as a problem when you go to sell.
Yes — solar requires its own building and electrical permits, plus a Permission to Operate (PTO) approval from your utility before the system can actually be turned on. We manage both the permitting and the utility interconnection process, so the system isn't sitting installed but inactive for weeks.
If we find rot once the old material is off, it gets documented with a written change order and repaired before any new roofing goes down — code and manufacturer warranties don't allow new material over damaged decking, so it isn't something either of us can skip. You see the cost and the reason before we proceed, not after.
Ready to start
your roofing project?
A free, no-obligation consultation. We respond within 24 hours.
Get a Free Quote